DOCUMENTS RISK PACKAGES ORDER
UK CONSTRUCTION · CDM 2015 · HSE ALIGNED
CDM
2015
COMPLIANT
HSE ALIGNED
SITE READY. 20 CONSTRUCTION SOP DOCUMENTS — READY TONIGHT
⚠ NOTICE TO ALL CONTRACTORS
"You just won your first contract. The principal wants your CPP, RAMS and induction register by Monday."
We have every document.
Ready in 20 minutes.

Professional. Editable. CDM 2015 compliant.
Written by site managers.
From £699 + VAT.
VERIFIED ✓
CPP RAMS SITE INDUCTION CDM 2015 RIDDOR 2013 HGCRA 1996 COSHH 2002 LOLER 1998 INSTANT DOWNLOAD FULLY EDITABLE WORD + EXCEL 30-DAY GUARANTEE CPP RAMS SITE INDUCTION CDM 2015 RIDDOR 2013 HGCRA 1996 COSHH 2002 LOLER 1998 INSTANT DOWNLOAD FULLY EDITABLE WORD + EXCEL 30-DAY GUARANTEE
20 DOCUMENTS.
ZERO EXCUSES.
Every document is professionally formatted, written against current UK legislation, and delivered as an editable Word or Excel file. Hover any card to see what's inside. Fold colour = pricing tier.
CB-SOP-09-01
DOCX
Construction Phase Plan (CPP)
Fully structured CPP meeting CDM 2015 Reg 12. Emergency plan, welfare, site rules, key personnel.
MANDATORY
CB-SOP-09-02
DOCX
RAMS Template
Risk Assessment & Method Statement. Pre-populated hazards, control measures, sign-off section.
CORE
CB-SOP-07-02
DOCX
Site Induction Sign-In Register
Pre-start induction record with 14 checklist topics. Attendee signature log. CDM compliant.
CORE
CB-SOP-07-01
DOCX
Site Daily Diary
Running daily log: weather, workforce, plant, visitors, instructions received, delays.
CORE
CB-SOP-07-03
DOCX
Site Visitor & Access Log
Controlled site access record. Visitor details, induction confirmation, sign in/out times.
CORE
CB-SOP-10-01
DOCX
Site Waste Management Plan
6-tier waste hierarchy, EWC codes, skip colours, duty of care log. 90%+ diversion target.
CORE
CB-BON-01
PPTX
Site Induction Presentation Deck
Ready-to-present PowerPoint for site inductions. Professional slides covering all HSE topics.
BONUS
CB-EST-01-01
XLSX
Bid Estimate & Material Takeoff
Excel-based estimating calculator. Labour, plant, material sections. Summary sheet with margin.
EXCEL
CB-FIN-01-02
XLSX
Application for Payment
HGCRA 1996 compliant interim valuation. Gross valuation, retention, previous certs, net due.
LEGAL
CB-FIN-01-03
XLSX
Subcontractor Payment Certificate
Issue payment certs to your subbies. HGCRA compliant. Pay-less notice provisions included.
LEGAL
CB-SOP-04-01
DOCX
Request for Information (RFI)
Formal RFI log with response tracking, design query management and priority classification.
CORE
CB-SOP-04-02
DOCX
Variation Order Form
Issue and receive variations. Cost and programme impact columns. Client sign-off section.
CORE
CB-SOP-04-03
DOCX
Extension of Time Notice
Formal EOT notification. Cause of delay, entitlement basis, programme impact statement.
CORE
CB-BID-01-01
DOCX
Tender Submission Cover Letter
Professional tender cover letter template. Qualifications, exclusions, validity period, sign-off.
CORE
CB-FIN-01-04
XLSX
Master Cash-Flow Forecasting Model
Rolling 52-week cash flow forecast. Income, expenditure, retention tracking, S-curve output.
EXCEL
CB-DSH-04-04
XLSX
Master Procurement Tracker
Track all materials and plant procurement. Lead times, order status, delivery schedule.
EXCEL
CB-REG-04-05
XLSX
Master Variation Register
Full project variation log. Running cost total, status tracking, approved vs pending.
EXCEL
CB-REG-04-06
XLSX
Master Subcontractor Ledger
Subcontractor financial ledger. Contract value, certified to date, retention, final account.
EXCEL
CB-BON-02
PPTX
Corporate Capability Statement
Professional PowerPoint capability statement. Projects, team, accreditations, contact page.
BONUS
CB-LEG-00-01
PDF
Product Terms & Disclaimer
Legal terms and disclaimer governing use of all SiteReady documents. All tiers included.
LEGAL
Tier 1 — Compliance Pack (£699)
Tier 2 — Commercial Growth (£1,499)
Tier 3 — Enterprise Suite (£2,499)
WHAT HAPPENS
WITHOUT THEM.
These aren't hypotheticals. HSE enforcement data shows these exact scenarios play out on UK construction sites every week. Every one of them is preventable with the right paperwork in place before work starts.
⚠ SCENARIO 01
NO CPP ON SITE
CDM 2015 REGULATION 12
Consequence:
£20,000+ FINE
+ potential HSE prosecution. Principal contractor liability. Immediate stop notice issued. Programme delay costs passed to you.
⚠ SCENARIO 02
NO RAMS SUBMITTED
BEFORE WORKS COMMENCE
Consequence:
REMOVED FROM SITE
Principal contractor ejects your workforce. Subcontract terminated for cause. Your operatives stand down — unpaid. Reputation destroyed on that supply chain.
⚠ SCENARIO 03
FAILED INDUCTION RECORDS
WORKER INJURED
Consequence:
PROHIBITION NOTICE
HSE investigation opens. No induction records = automatic aggravated breach. Site shut. Directors personally liable. EL insurance may void. Career-ending.
OR: SPEND £699 AND HAVE
EVERYTHING YOU NEED BY TONIGHT.
THREE PACKS.
ONE DECISION.
No subscription. No consultant day rate. No DRM. Pay once, download immediately, edit with your company name and logo — they're yours.
Tier 1
SITE-READY
COMPLIANCE PACK
Essential H&S docs for subcontractors & sole traders
CB-SOP-09-01 — Construction Phase Plan (CPP) MANDATORY CDM 2015
CB-SOP-09-02 — RAMS Template
CB-SOP-07-02 — Site Induction Sign-In Register
CB-SOP-07-01 — Site Daily Diary
CB-SOP-07-03 — Site Visitor & Access Log
CB-SOP-10-01 — Site Waste Management Plan
CB-BON-01 — Site Induction Presentation Deck (PowerPoint) BONUS
CB-LEG-00-01 — Product Terms & Disclaimer
One-time payment
£699
+ VAT
↑ Save £3,000+ vs consultant
GET THIS PACK →
Tier 2 — Most Popular
COMMERCIAL
GROWTH SYSTEM
Full document suite for contractors winning bigger jobs
Everything in Tier 1 (7 documents)
CB-EST-01-01 — Bid Estimate & Material Takeoff Calculator
CB-FIN-01-02 — Application for Payment HGCRA 1996
CB-FIN-01-03 — Subcontractor Payment Certificate
CB-SOP-04-01 — Request for Information (RFI)
CB-SOP-04-02 — Variation Order Form
CB-SOP-04-03 — Extension of Time Notice
CB-BID-01-01 — Tender Submission Cover Letter
One-time payment
£1,499
+ VAT
↑ Save £6,000+ vs consultant
GET THIS PACK →
FULL PACKAGE
Tier 3 — Complete Suite
ENTERPRISE
TURNKEY SUITE
All 20 documents — for established contractors & growing businesses
Everything in Tier 1 + Tier 2 (14 documents)
CB-FIN-01-04 — Master Cash-Flow Forecasting Model
CB-DSH-04-04 — Master Procurement Tracker
CB-REG-04-05 — Master Variation Register
CB-REG-04-06 — Master Subcontractor Ledger
CB-BON-02 — Corporate Capability Statement (PowerPoint) BONUS
CB-LEG-00-01 — Product Terms & Disclaimer
Priority email support · 12-month free updates
One-time payment
£2,499
+ VAT
↑ Save £12,000+ vs consultant
GET THIS PACK →
BUILT FOR PEOPLE
WHO BUILD THINGS.
🪖
NEW SUBCONTRACTOR
First site · First contract
ID: SR-PERSONA-001
Biggest headache
"The principal is asking for a CPP and RAMS before I can start. I don't know where to begin."
SiteReady solves it
Tier 1 gives you a fully structured CPP and RAMS template that any principal contractor will accept. Ready to edit in Word within minutes of purchase.
📋
FIRST MAIN CONTRACT
Direct client · CDM notifiable
ID: SR-PERSONA-002
Biggest headache
"We're now the principal contractor. The CDM coordinator wants our full Construction Phase Plan before works start."
SiteReady solves it
The CPP template is pre-structured to meet CDM 2015 Regulation 12. Section headings, emergency plan, welfare arrangements — all populated and ready to customise.
📊
GROWING TRADE BUSINESS
4–15 operatives · Tendering work
ID: SR-PERSONA-003
Biggest headache
"We're winning more tenders but our commercial paperwork is a mess — variations undocumented, applications for payment informal."
SiteReady solves it
Tier 2 adds the Variation Order Form, Application for Payment (HGCRA 1996 compliant), RFI register, and Extension of Time Notice — your commercial backbone, sorted.
🏗️
ESTABLISHED CONTRACTOR
15+ operatives · Multiple sites
ID: SR-PERSONA-004
Biggest headache
"We need to look professional when tendering for £500k+ contracts. Our current docs look like they were made in 2012."
SiteReady solves it
Tier 3 includes the Corporate Capability Statement, Master Cash-Flow Model, Subcontractor Ledger and Procurement Tracker — everything needed to present as a serious business.
PLACE YOUR
ORDER.
SITEREADY SOP
UK Construction Compliance Documents
orders@sitereadysop.co.uk  · 
PURCHASE ORDER
PO NUMBER: SR-88047
DATE: 21 May 2026

SR-88047

ORDER RECEIVED.

Your purchase order has been logged.
You'll receive your download link at the email address provided within minutes.

Check your spam folder if it doesn't arrive within 5 minutes.

Questions? Email orders@sitereadysop.co.uk

Claude is active in this tab group